Solar Panel Installation in GorakhpurFree Site Visit · AdiSolar

Serving Gorakhpur homeowners, businesses, and institutions. Certified technicians. PM Surya Ghar subsidy assistance included.

Gorakhpur receives 5.2 peak sun hours/day · Average bill: ₹1,500–₹5,000/month · DISCOM: PUVVNL (Purvanchal Vidyut Vitaran Nigam Limited)

Certified Technicians
Site Visit Within 48 Hours
PM Surya Ghar Subsidy Handled
Book Free Site Visit in Gorakhpur

Get a Free Site Visit in Gorakhpur

Solar in Gorakhpur

Why Solar Makes Sense in Gorakhpur

Gorakhpur experiences frequent power cuts and high grid dependence. Solar gives you energy independence — your home stays powered even when the grid goes down. With a hybrid system and battery backup, you're completely protected from outages.

  • Gorakhpur receives 5.2 peak sun hours/day — strong solar yield year-round

  • Electricity from PUVVNL (Purvanchal Vidyut Vitaran Nigam Limited) costs ₹7–10/unit — making solar ROI highly attractive here

  • PM Surya Ghar subsidy of up to ₹78,000 available to all Gorakhpur homeowners

  • AdiSolar engineers are familiar with PUVVNL (Purvanchal Vidyut Vitaran Nigam Limited) net metering requirements and DISCOM inspection processes in Uttar Pradesh

Ready to go solar in Gorakhpur?

Our certified engineers visit Gorakhpur regularly. Book a free, no-obligation site visit and receive a detailed quote within 48 hours.

Our Customers

Solar Solutions for Every Need in Gorakhpur

Residential

Homes and apartments in Gorakhpur — protect against power cuts.

Commercial

Offices, shops, and commercial establishments.

Industrial & Institutional

Factories, schools, colleges, and hospitals.

How It Works

Our Installation Process in Gorakhpur

Free Site Visit

Our engineer visits your Gorakhpur property at zero cost.

Energy Evaluation

We size the perfect system for your consumption and backup needs.

Custom Design

On-grid or hybrid system designed for your PUVVNL connection.

Professional Installation

Certified technicians install your system in 1–2 days.

Monitor & Support

Net metering filing with PUVVNL and ongoing support.
Common Questions

Solar FAQs for Gorakhpur

Which DISCOM handles net metering in Gorakhpur?

PUVVNL (Purvanchal Vidyut Vitaran Nigam Limited) handles net metering in Gorakhpur. AdiSolar manages the complete application as part of your installation — no DISCOM office visits needed.

How long does installation take in Gorakhpur?

Most residential installations in Gorakhpur are done in 1–2 days. We schedule at your convenience and ensure minimum disruption to your daily routine.

Do you provide maintenance services in Gorakhpur?

Yes — we have service coverage across Gorakhpur and nearby areas. Annual Maintenance Contracts (AMC) are available for all our installations, covering cleaning, inspection, and performance monitoring.

How quickly can I get a site visit in Gorakhpur?

We schedule site visits in Gorakhpur within 24–48 hours. Book online or call +91 8882088600.

Have more questions about solar installation in Gorakhpur?

Book a Free Consultation

Ready to go solar in Gorakhpur?

Stop depending on the grid. Our engineer will visit within 48 hours.